Sumedang Demo-Plot

Home – Projects

Sumedang Demo-Plot

Screenshot 2026-06-23 101449

Project Overview

The Sumedang Demo-Plots at Jatigede (2024) and Ujungjaya (2025) focus on testing the intercropping of Pongamia (Malapari) with sorghum varieties, specifically Bioguma at Jatigede and both Bioguma and Binex at Ujungjaya. The Jatigede plot was established in February 2024 to evaluate ratoon potential. The Ujungjaya plot (7,500 m2) was established in February 2025 later, in September 2025, a second planting phase expanded the total area by and additional 7,500 m2. It serves as an adaptation trial site and is part of the Sorghum Value Chain Study collaboration, intended to optimize sorghum cultivation and evaluate the resulting biomass for bioenergy product such as biopellets and bioethanol.

Other Projects

Sustainable Green Energy Projects

Explore various initiatives by PT SANTI Energi Hijau in developing bioenergy solutions based on Pongamia and sorghum to support clean energy transition and reduce greenhouse gas emissions.

The Sorghum Value Chain Study aims to establish a comprehensive renewable energy ecosystem in Indonesia by developing multiple sorghum co-products...

The collaboration between the East Sumba Regional Government, Terviva, and Seh/Santi Group officially commenced with the groundbreaking planting of 100...

The Sumedang Demo-Plots at Jatigede (2024) and Ujungjaya (2025) are conducting tests for the intercropping of Pongamia (Malapari) with sorghum...

This is the heading

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.